A technology due diligence checklist is a structured list of questions and evidence requests that buyers use to test a target company’s technology before closing a deal. It covers eight areas: architecture, code quality, security, infrastructure, data, team, IP and product roadmap. Each item gets a red, amber or green score that feeds price and terms.
The stakes justify the effort. 70 to 75% of corporate acquisitions fail (NYU Stern, 2024), and a technology problem found after closing is the buyer’s to pay for. Below you’ll find the full checklist as eight tables, a scoring method and guidance on turning findings into deal terms. Use it as the first pass of a technology due diligence review, whether you’re buying, investing or preparing a portfolio company for a sale.
Free template: make your own copy of the checklist in Google Sheets. It includes all 64 items below, a red/amber/green scoring column, space for evidence, owners and estimated cost to fix, and a summary tab that rates each area automatically.
What is a technology due diligence checklist?
Definition: A technology due diligence checklist is a working document that pairs each question about a target company’s technology with the evidence that proves the answer and a score for the risk. Buyers and investors use it to judge whether the product, systems, data and team can carry the growth case in the deal model.
Financial and legal diligence show what a business has earned and what it owes. This checklist tests whether the systems behind those numbers will hold up as volumes grow. Every line ties to a risk that can change the price, the deal terms or the plan for the first months of ownership, so the deal team knows why each question is asked and what a bad answer costs.
Private equity firms, strategic acquirers and growth investors use it at four points in a deal:
| Stage | Scope | Time needed | Output |
| Before the letter of intent | Public information, a product demo, one or two management calls | Two to three days | Deal breakers and open questions for the full review |
| Confirmatory diligence | Full checklist, data room, interviews, code and infrastructure access | One to four weeks, set by the deal clock | Scored report and investment committee summary |
| Signing | Costed findings from the report | Runs alongside negotiation | Inputs to the valuation model, purchase agreement and 100-day plan |
| Ahead of a sale | Full checklist, run by management on its own company | 6 to 12 months before the process opens | Remediation list and a prepared data room |
Tech due diligence checklist: the eight areas at a glance
The tech due diligence checklist below is split into eight areas. Each one answers a single question the investment committee will ask.
| Area | Question it answers | Who usually answers |
| Architecture and scalability | Can the system carry the growth in the deal model? | CTO, lead architect |
| Code quality and technical debt | How much rework is hidden in the codebase? | Engineering leads |
| Security and compliance | What exposure comes with the company? | Security lead, legal counsel |
| Infrastructure and costs | What does the technology cost to run, and how does that scale? | DevOps lead, finance |
| Data and analytics | Can the reported numbers be trusted? | Data lead, RevOps |
| Team and processes | Does delivery depend on a handful of people? | CTO, HR |
| IP and licensing | Does the company own what it sells? | Legal counsel, CTO |
| Product roadmap | Is the plan funded, staffed and tied to revenue? | Product lead, CEO |
Every table that follows uses the same three columns: the item to check, the evidence to request and the warning sign that should lower the score. Ask for evidence instead of accepting a verbal answer. A diagram, a report export or a repository log takes minutes to produce if the practice exists.
Architecture and scalability
Start here, because architecture sets the ceiling for everything else in the checklist. The test is whether the system can handle the customer, transaction and data volumes in the growth case without a rebuild.
| What to check | Evidence to request | Warning sign |
| System architecture and main components | Current architecture diagram, list of services and data stores | No diagram exists, or it’s years out of date |
| Load capacity against the growth case | Load test results, peak usage figures for the last 12 months | No load testing, or outages during past peaks |
| Single points of failure | Dependency map, failover design | One database, server or third-party service can take the product down |
| Technology stack currency | Languages, frameworks and versions with end-of-support dates | Core components past vendor support |
| Integrations and APIs | API documentation, integration list with owners | Undocumented point-to-point integrations only one person understands |
| Multi-tenancy and customer-specific code | Tenancy model, list of customer forks or custom builds | Separate code branches for large customers |
| Uptime and performance history | SLA reports, incident log for 24 months | Repeated SLA breaches, or no incident log at all |
To test the scalability claim, take the year-three customer and transaction volumes from the deal model and ask the lead architect which component fails first at that load. Compare the answer with the incident log. If one component keeps appearing in incidents, that’s the working limit of the system today.
Judge the design by how safely it changes. A well-structured monolith with solid test coverage carries less risk than a set of microservices nobody fully understands. If a rebuild is needed during the hold period, put its cost and timeline in the model before signing.
Code quality and technical debt
Technical debt is the cost of past shortcuts, paid later as slower releases and more defects. It rarely shows up in the financials, and plenty of teams don’t track it: only 8 of the 16 defense and industry organizations in a congressionally mandated study were actively managing their technical debt (Carnegie Mellon Software Engineering Institute, 2023). This part of the checklist has to surface the debt and put a number on it.
| What to check | Evidence to request | Warning sign |
| Code review of core repositories | Read-only repository access or an independent code scan | Access refused with no workable alternative |
| Automated test coverage | Coverage reports, CI pipeline configuration | Billing, authentication or other critical paths with no automated tests |
| Technical debt register | Backlog of known debt with effort estimates | No register, and the team can’t estimate the rework |
| Delivery performance | Deployment frequency, lead time for changes, change failure rate and time to restore service for 12 months | Metrics not tracked, releases slowing down, frequent hotfixes |
| Defect trends | Bug tracker export by severity and age | Growing backlog of high-severity bugs |
| Documentation | Setup guides, architecture decision records, runbooks | New engineers need months to become productive |
| Dependency health | Dependency list with versions and known vulnerabilities | Abandoned libraries, unpatched critical vulnerabilities |
Put a number on the debt in three steps. Ask the engineering leads for their own estimate in engineer-months, compare it with what an independent code scan shows, then multiply the agreed figure by the fully loaded monthly cost of an engineer. A register of 18 engineer-months at $15,000 a month, for example, becomes a $270,000 remediation item in the model. A large gap between the team’s estimate and the scan is a finding in itself.
Security and compliance
Security problems transfer to the buyer along with the shares. When Marriott bought Starwood for $13.6 billion in 2016, neither company knew about a breach of Starwood’s reservation system dating back to 2014 (Harvard Business Review, 2019). Marriott’s final count put the exposure at up to 383 million guest records (Marriott, 2019).
| What to check | Evidence to request | Warning sign |
| Security policies and ownership | Information security policy, named security owner | No named owner, policies never updated |
| Penetration tests and vulnerability scans | Last two external penetration test reports with remediation status | No external test in 12 months, open critical findings |
| Incident and breach history | Incident log, breach notifications, regulator correspondence | Undisclosed incidents, no incident response plan |
| Access control | User access reviews, MFA coverage, admin account list | Shared admin credentials, former employees with active access |
| Data protection compliance | GDPR and CCPA records of processing, data processing agreements, privacy policy | Personal data held with no mapping or legal basis |
| Certifications and audits | SOC 2, ISO 27001, PCI DSS or HIPAA reports, as applicable | Certifications claimed in sales material that have lapsed |
| Encryption and secrets management | Encryption standards, key management approach | Secrets stored in code, unencrypted customer data |
| Backup and disaster recovery | Recovery plan, date of the last restore test, recovery time targets | Backups that have never been restored in a test |
| Cyber insurance | Current policy, coverage limits, claims history | No cover, or past claims missing from the disclosures |
Policies show intent, so test the practice with three checks that take less than a day:
- Access. Compare the accounts with production access against the current HR roster. Former employees and shared logins show up immediately.
- Recovery. Ask for the date and result of the last backup restore, along with how long it took.
- Remediation. Match every critical finding in the latest penetration test to the ticket that closed it.
A target that produces all three without a scramble runs security as a routine. One that can’t is telling you the policies exist on paper only.
IT due diligence checklist: infrastructure and costs
This part works as an IT due diligence checklist for hosting, internal business systems and vendor contracts. The goal is a clear picture of what the technology costs to run today and how that cost moves as revenue grows.
| What to check | Evidence to request | Warning sign |
| Hosting and cloud setup | Cloud account structure, environment list, infrastructure-as-code repositories | Production servers configured by hand |
| Cloud and hosting spend | 24 months of invoices broken down by service | Cost growing faster than revenue or usage |
| Infrastructure cost per customer | Unit cost calculation, gross margin bridge | Nobody can tie cost to usage |
| Software licenses and SaaS subscriptions | License inventory with renewal dates and owners | Unused seats, auto-renewals nobody tracks |
| Vendor contracts | Ten largest technology contracts with full terms | Change-of-control clauses, minimum commitments, one critical vendor with no alternative |
| Monitoring and alerting | Monitoring tools, on-call schedule, alert history | Customers report outages before the team sees them |
| Business systems (CRM, ERP, billing) | System list, integration map, admin owners | Revenue data spread across disconnected systems |
| Hardware and end-of-life assets | Asset register with support dates | Production running on unsupported hardware or operating systems |
| Systems shared with the seller (carve-outs) | List of shared systems, licenses and IT staff, draft transition services agreement | Core systems with no separation plan or separation budget |
Calculate hosting and infrastructure cost as a share of revenue for each of the last eight quarters. A flat or falling share shows the platform scaling with the business. A rising share means each new customer costs more to serve than the last, and the gross margin in the growth case has to come down to match.
Read the change-of-control clauses closely too. A hosting or data contract the vendor can renegotiate after the sale changes the cost base on day one.
Data and analytics
The growth case rests on numbers such as recurring revenue, churn and pipeline. This section checks whether those numbers can be reproduced from source systems, which is where revenue operations and technology diligence meet.
| What to check | Evidence to request | Warning sign |
| Data architecture | Data flow diagram, list of sources, warehouse schema | No central store, reports built from spreadsheet exports |
| KPI definitions | Metric dictionary for ARR, churn, CAC and pipeline | Sales, finance and product report different figures for one metric |
| Reconciliation of board metrics | Rebuild of ARR and churn from CRM and billing data | Reported figures can’t be reproduced from raw data |
| CRM data quality | Duplicate rate, field completeness, stage history | Opportunities with missing amounts, close dates or owners |
| Data governance | Data owners, access rules, retention policy | No owner for customer or revenue data |
| Reporting and BI tooling | Dashboard list, refresh schedules | Board pack assembled by hand every month |
| AI and machine learning readiness | Inventory of models, training data sources and usage rights | AI features in the pitch with no production model behind them |
| Revenue systems | Lead-to-cash process map, integrations between CRM, marketing automation and billing | Pipeline and forecast kept in spreadsheets outside the CRM |
Run one reconciliation before anything else. Take the ARR reported to the board for the last three month-ends and rebuild it from billing exports and closed-won records in the CRM. The differences tend to come from one-off services counted as recurring, contracts booked before signature and churn recorded late. Each of those changes the revenue base the buyer is paying a multiple on, so a gap here goes straight to the valuation.
Team and processes
A buyer acquires the people who run the technology along with the technology itself. Key-person dependency is the risk to size here, especially if founders or early engineers plan to leave after the sale.
| What to check | Evidence to request | Warning sign |
| Org chart and roles | Engineering org chart with tenure and location | Unfilled lead roles, one manager with 15 or more direct reports |
| Key-person dependencies | List of systems with named owners and backups | Critical systems only one engineer can change |
| Retention and attrition | Engineering attrition for 24 months, retention agreements | Recent senior departures, no retention plan for the deal |
| Contractors and outsourced development | Contracts, share of work done externally | Core product built by a vendor with no knowledge transfer terms |
| Development process | Sprint cadence, code review rules, definition of done | Changes reach production without review |
| Delivery track record | Planned against delivered roadmap items for four quarters | Persistent slippage with no explanation |
| Onboarding and knowledge sharing | Onboarding plan, internal wiki | Knowledge lives in chat threads and people’s heads |
| Hiring pipeline and pay | Open roles, time to hire, salary benchmarks | Pay well below market in key roles |
Key-person risk can be measured from the repositories. Pull 12 months of commit history for each critical service. If one engineer wrote more than half of the changes, that service has a single owner, even if the org chart lists a team.
Interview two or three engineers below the CTO as well. They know which parts of the system nobody wants to touch, and their answers show whether the documented process is the one people follow. Named dependencies then go into the term sheet as retention packages tied to the first 12 to 24 months.
IP and licensing
Ownership gaps are cheap to fix before signing and expensive afterward. Confirm that the company owns its code, has the right to use everything it ships and hasn’t taken on open-source obligations that conflict with its commercial license.
| What to check | Evidence to request | Warning sign |
| IP assignment from employees | Signed invention assignment agreements for current and former engineers | Missing agreements for founders or early hires |
| IP assignment from contractors and agencies | Contractor agreements with assignment clauses | Contractor-written code with no assignment |
| Open-source usage | Software bill of materials (SBOM) or license scan | Copyleft licenses (GPL, AGPL) inside distributed proprietary code |
| Third-party commercial licenses | License agreements for embedded components and data | Licenses that don’t transfer on a change of control |
| Patents, trademarks and domains | Registration list, ownership records | Domains or trademarks registered to an individual |
| IP disputes | Litigation history, claims, demand letters | Open or threatened infringement claims |
| AI-generated code | Policy on AI coding tools, review rules | AI output merged with no review or license check |
| Source code escrow | Escrow agreements, release triggers | Release triggers tied to a change of ownership |
Generate the software bill of materials with an automated scan instead of accepting a self-declared list, because license conflicts tend to sit in dependencies of dependencies. Give AGPL components in a SaaS product a close look, since that license’s source-sharing terms extend to software offered over a network.
Contractor code needs the same attention. Without a written assignment, a contractor generally keeps the copyright in what they wrote, so counsel should close every gap with a signed agreement as a condition to closing.
Product roadmap
The roadmap section tests the link between what the company plans to build and the revenue the deal model assumes. A roadmap with no capacity plan behind it is a wish list.
| What to check | Evidence to request | Warning sign |
| Roadmap for the next 12 to 24 months | Current roadmap with priorities and dates | No written roadmap, or one rewritten every quarter |
| Link to the revenue plan | Roadmap items mapped to revenue or retention targets | Growth case depends on features that haven’t been started |
| Capacity and budget | Headcount plan and R&D budget against the roadmap | Roadmap needs more engineers than the plan funds |
| Maintenance and new development split | Engineering time allocation for 12 months | Bulk of capacity spent keeping the product running |
| Customer commitments | Contractual feature commitments and deadlines | Large deals closed on promised features |
| Product usage and adoption | Feature usage analytics, retention by cohort | Low usage of the features central to the pitch |
| Competitive position | Win/loss analysis, competitor feature comparison | Losses concentrated around one missing capability |
| R&D spend and capitalization | R&D spend as a share of revenue, capitalization policy | Aggressive capitalization that inflates EBITDA |
Take the five largest revenue assumptions in the deal model and trace each one to a roadmap item, an owner and a delivery date. An assumption with nothing behind it is unfunded growth. Then look at the split of engineering time. If maintenance and support take more than half of capacity, the plan needs either a smaller roadmap or more headcount, and both change the numbers the investment committee sees.
How to use the checklist
Work through the checklist in five steps.
- Scope it to the deal. Weight the eight areas by the investment thesis. The first table below shows where to go deeper for five common deal types.
- Send the evidence requests early. Share the request list as soon as the data room opens and give every item a named owner on the target’s side.
- Score every item red, amber or green. Use the definitions below so two reviewers reach the same score.
- Put a cost and a timeline on every red and amber item. A finding with no number attached can’t be negotiated.
- Summarize for the investment committee. Keep it to one page: a rating per area, the five biggest findings, total remediation cost and the effect on the growth case.
Weight the areas by deal type
The eight areas don’t carry equal risk in every deal. Decide where the extra hours go before the data room opens.
| Deal type | Areas to weight | Why |
| Buy-and-build platform | Architecture and integrations, data, infrastructure | The platform has to absorb add-on acquisitions quickly |
| Carve-out | Infrastructure, IP and licensing, team | Systems, licenses and staff are shared with the seller |
| Growth equity, minority stake | Architecture, team, product roadmap | The investor backs management’s plan and has limited control to fix problems later |
| Product-led SaaS | Code quality, security, product roadmap | The product is the revenue engine |
| Tech-enabled services | Data, business systems, infrastructure costs | Margin depends on internal systems more than on proprietary code |
Score each item red, amber or green
| Score | What it means | What to do |
| Green | Evidence provided, practice in place, no material risk to the growth case | Record it and move on |
| Amber | A gap exists, and it can be fixed in the first year at a known cost | Add it to the 100-day plan and the budget |
| Red | Material risk to value, timeline or legal position | Quantify it, then deal with it in price or terms before signing |
Agree on a materiality threshold before scoring starts, so red means the same thing to every reviewer. One example: flag any single item that costs more than 1% of enterprise value to fix, or that delays the growth plan by a quarter or more. Roll the scores up conservatively, so one red item makes the whole area red. Missing evidence scores red until it’s supplied.
Turn findings into deal terms
Once every item has a score, the findings feed the deal in four ways:
- Price. Remediation cost comes off the valuation or goes into the capital plan. After Yahoo disclosed two data breaches, Verizon cut its purchase price by $350 million (Verizon, 2017), and Yahoo agreed to share the cost of related investigations and lawsuits.
- Terms. Red items the seller can fix become conditions to closing, such as signing missing IP assignments. Risks that can’t be fixed in time are covered by specific indemnities, escrow or a holdback.
- The 100-day plan. Amber items go in with an owner, a budget and a deadline, so remediation starts the week the deal closes.
- The decision itself. A red item that can’t be priced or fixed is a reason to walk away.
Here is how six sample findings would be scored and where each one lands. The figures are illustrative.
| Finding | Score | Cost to fix | Where it lands |
| Two founders never signed IP assignments for the original code | Red | Legal fees | Condition to closing: signed assignments |
| Main database can’t carry year-two volumes without re-architecture | Red | $400,000 and nine months | Price reduction and a later start for the growth case |
| Reported ARR includes $300,000 of one-off services | Red | None, but recurring revenue is lower | Valuation recalculated on corrected ARR |
| Hosting contract has a change-of-control clause | Amber | Depends on renegotiation | Seller obtains vendor consent before closing |
| Billing module has 20% automated test coverage | Amber | Three engineer-months | 100-day plan, with budget |
| No backup restore test in 18 months | Amber | Two engineer-weeks | 100-day plan, first 30 days |
How DevriX helps. DevriX runs this review for PE firms, growth investors and operating partners: a scored, investment-committee-ready read on a target’s technology, data and revenue systems, scaled to the deal clock. If the deal closes, the same team turns the findings into the 100-day plan and builds it.
FAQ
What should a technology due diligence checklist include?
It should cover eight areas: architecture and scalability, code quality and technical debt, security and compliance, infrastructure and costs, data and analytics, team and processes, IP and licensing, and the product roadmap. For each item, list the evidence to request and the warning sign that lowers the score.
How long does technology due diligence take?
The timeline follows the deal clock. A screen before the letter of intent takes two to three days, using public information and management calls. A full review with code, infrastructure and data access takes one to four weeks, in parallel with financial and legal diligence. Late evidence is the usual cause of overruns, which is why the request list goes out on day one.
Who should run the checklist?
Someone independent of the target with hands-on engineering, security and data experience. PE firms use an internal technology partner, a specialist diligence firm or an operating partner with a delivery team. The target’s CTO supplies the evidence and shouldn’t be the one scoring it.
What’s the difference between a tech due diligence checklist and an IT due diligence checklist?
The two terms overlap and are frequently used for the same document. An IT due diligence checklist traditionally concentrates on internal systems, infrastructure, licenses, vendor contracts and IT costs. A tech due diligence checklist adds the product itself: code, architecture, engineering team and roadmap. A software or tech-enabled company needs both, so this template combines them.
What are the most common findings?
The red flags that come up again and again are undocumented architecture, technical debt nobody has estimated, key-person dependency, missing IP assignments from early contractors and board metrics that can’t be reproduced from source data. None of them has to end a deal alone. Each one needs a cost, an owner and a place in the price, the terms or the 100-day plan.
Can a seller use the same checklist?
Yes. Running it 6 to 12 months before a sale gives management time to fix red and amber items, assemble the evidence and open a cleaner data room. Buyers discount what they can’t verify, so prepared evidence protects the price late in the process.
Conclusion
A technology due diligence checklist gives the deal team a consistent way to test what they’re buying: eight areas, evidence behind every answer and a red, amber or green score that converts into price, terms and a 100-day plan.
Adapt the template to your investment thesis, send the evidence requests early and put a cost on every finding before the investment committee meets.
If you have a live deal or a portfolio company heading toward a sale, talk to DevriX about a scored review on your timeline.